Выполненные работы

Клиент Наименование работ Благ. письмо

Operation and maintenance of external and internal heating networks, individual heat points (ITP), hot and cold water:

  • annual maintenance, the control parameters of heating systems (temperature and pressure);
  • Maintenance ITP and thermal networks;
  • Maintenance of valves, instrumentation, control devices;
  • seasonal service ITP and thermal networks (cleaning, repair and installation of equipment, to the density and strength of the test).
Operation and maintenance of external and internal heating networks

Construction and installation work of the electrical equipment Metso drying complex with auxiliary equipment and electrical installation work in sets and high-voltage cells.

Execution of works on the implementation of the high-voltage and low-voltage part of the project "Modernization of Bagels"

Installation and commissioning work on the construction of power supply facilities steeply inclined conveyor (KNK) Olenegorsky mine

  • installation of pipeline complex in electrical Paakkola
  • Installation of high-voltage control cabinet Schneider
  • installation of cable lines 0,4 kV
  • electrical installation
Installation and commissioning work on the construction of power supply facilities steeply inclined conveyor
  • Repair work on the tower dome warehouse number 2004, 2007, 2009
  • forklifts building repairs
Repair works domed towers warehouse number 2004, 2007, 2009